|
||
|
||
Powered by Macroaxis |
||
EURASIA HOME |
||
Growth and Strength |
||
|
PROJECT CONSULTING IN CENTRAL ASIAN COUNTRIES |
DOWNLOAD SOLAR IRADIATION MAP OF TURKEY BY CLICKING BELOW MAP |
|
GRID TIED UTILITY SCALE SOLAR PHOVOLTAIC POWER PLANTS |
Developing a PV project is a process involving many stages and requires a multidisciplinary team of experts. The project developer starts by identifying a power market that offers adequate risk-reward opportunities, then identify a promising site and secures the land-use rights for this site, carries out two separate rounds of technical-fi assessments (prefeasibility study and feasibility study), obtains all required permits and licenses, secures power purchase and interconnection agreements, arranges financial assessments and selects a team to design and construct the project (often an EPC contractor), supervises plant construction, and carries out testing and start-up. As the project moves from one stage to the next, the technical-financial assessments become more detailed until a fi design is developed and construction starts. |
OPTIMUM STRING SIZING CALCULATION OF GRID CONNECTED UTILITY SCALE SOLAR PHOTOVOLTAIC OWER PLANTS |
5 MW SKID MOUNTED OUTDOOR UPS FOR UTILITY SCALE SOLAR PHOTOVOLTAIC POWER GENERATION SYSTEMS |
|
|
PROJECT FINANCING IN EXCHANGE EQUITY PARTICIPATION-CALL US FOR HELP |
WE ACCEPT ABOVE CRYTO CURRENCIES IN YOUR PAYMENTS |
Since 1974 "Pakpas©Group" And Eurasia Merging All rights reserved. Rev-10.06 eurasia@eurasia-medic.com pakpas@pakpas.org pakpas@pakpas.net |